Skip to main content

ROC NOIR, Greater Chambery

ROC NOIR, Greater Chambery

CASERNE 13ème BCA
Barby, Rhône-Alpes 73230
France

Military camp of Roc Noir (Savoie), which houses 700 people of the 13th Bataillon de Chasseurs Alpins, is the first eco-military site. The EDF Group was chosen by the French Army for the implementation, commissioning, operation and maintenance, including financing for the first French Army Energy Performance Contract. The Ministry of Defence has signed with EDF Optimal Solutions, a subsidiary of EDF, its first partnership agreement and energy performance. After two years of work, amounting to 12.5 M€, 30 buildings have undergone an energy renovation.

A wood boiler was created, producing 40% of the heating needs of the camp; 14 solar carpet areas of 100 m² each were installed on the rooftop for the production of domestic hot water; 14 buildings are heated with heat pumps; 58% of energy consumption of renovated buildings will be covered from renewable energies.

This project was tailor-made in order to fit the French Army's requirements, such as:

  • First sustainable military camp
  • Facilities modernization
  • HVAC system improvements for the soldiers's comfort
  • Transparent financial structure under form of annual rent with excellent visibility over expenses
  • 45% of work to small business
  • User awareness to energy conservation
  • Deployment of digital intelligence for monitoring and control of energy performance
Member's role
ESCO
Type of Energy Service or Contract
Energy Performance Contract (EPC)
Type of contract (additional info)

Contrat de Partenariat de Performance Énergétique (CPPE)

Baseline
an annual energy bill of 530 k€
640 tons of CO₂ rejected annually, or 400 new cars in circulation
Size
30 buildings concerned
42 000 m² of heated area
Investment
around 12.5 M€
Financing mechanism
Financed by the creation of a SPV (Eco Roc Noir)
Contract duration
20 years
Performance

30 buildings refurbished
46% of energy saved
50% of CO₂ reductions
58% of the energy needs from renewable
85% of the heat provided by wood energy
Results guaranteed over 18 years
200 k€ saved annually