Uitgeverij Averbode

Uitgeverij Averbode

Averbode

In spring 2013, Factor4 realised energy audits and implemented recommended measures at the company's location in Averbode. A comfort survey was also conducted in the offices using Comfortmeter, an online comfort surveying tool (www.comfortmeter.eu).

LESSONS LEARNED

A re-commissioning project can generate energy cost savings as well as improved building comfort.

If new HVAC equipment is installed, it is good to check the design of the initially proposed HVAC installation and to (re-)commission the installation immediately after the final installation by the contractor.

Member's role
ESCO
Type of Energy Service or Contract
Energy Performance Contract (EPC)
Baseline
51.000 €/year
Electricity 197.000 kWh/Year
Gas 538.000 kWh/year
C02 175 tons/year
Size
5.800 m²
Investment
30.000 €
Financing mechanism
Self-financing by customer
Contract duration
2 years
Performance

Total Energy Cost Savings 20%, 10.000 €/year
Electricity savings 9%
Gas savings 31%
CO2 17%, i.e. 30 tons/year